4.0m Long x 5m Wide Polycarbonate Roof Kit

£581.89 Ex Tax: £484.91

Available Options

Select the type and the colour required.

Price includes (Actual coverage 5.370mm) 
5no 1050mm x 4m polycarbonate roof sheets 
6no x 4m bars to fix to timber 
2no x 4m edge fillets 
1no x 150mm flash band 
3no 2.1 m sheet closures 
Anti-dust tapes 

Installation Guide

Step one 

Fix your first edge bar, as shown in Figure 1. Slide the edge fillet up the grove on the bar as shown, then cut the bar to length, remembering to allow for a 50MM overhang into the guttering. Cut the aluminium base 2MM longer than the intended length, allowing the end cap to be fitted later.
Drill and Fix the bar into position screw with no six screws at 3-400MM centres, Ensuring the drip on the edge trim is in the required place and neat from the external view. Repeat on the opposite end, Dia 1.
N.B. Where bars are butting against the wall, the edge trim is not required to fit only the bar.

Step two 

You can cut all sheets to space them out evenly or work towards cutting a sheet in the middle once you have decided to start fixing the centre bars in your required position. Drill and fix the bars with screws at 3-400MM centres

IMPORTANT REMEMBER TO LEAVE A CLEAR EXPANSION GAP OF 4MM BETWEEN THE BAR AND THE SHEETS.

Step three 
Ensure all the rubber gaskets in the bars are flat with no bumps.

Step four
Cut your sheets the length if not already done, ensuring all swarves are removed. Use a vacuum or condensation-free airline to remove the swarf (never try to wash it out). Now, fit anti-dust tapes to the sheet. Use the solid foil tape to the top of the sheet and the vented tape to the bottom. Peel the backing tape and stick it in place as shown. These tapes reduce condensation and keep out insects and dust, so ensure they are fitted correctly. Now peel about 50MM of the protective film down both sides and place the sheet in place.

Step Five
Position PVCU caps so that the toothed legs are located inside the centre of the aluminium base. Press down firmly, then hammer down lightly with a rubber mallet or equivalent until the caps lock down. As you work across the roof, complete flashing as you go (see tips).
Remove the protective covering when the flashing is complete, and all caps are in place.

Step Six
Fit the end caps into place. Cut the sheet closures to the length between the bars and push them to place as shown.

Tips

For cut-to-size, order after you have fitted your bars, and we can cut, blow, and tape your sheets for you to the correct size (width and length). N.B., do not forget to allow for expansion when ordering. (P.O.A)
If using a lead flashing, ensure the lead (recommended) is fitted before the sheets and dressed down as you fit the roof panels. Fit your lead in sections of 2m and seal the overlap 100mm with a lead mate.

Cleaning only uses mild, soapy water. Try a small panel first to ensure there is no reaction. Never use solvent-based cleaners.
You should not need to use silicone; however, only use good quality modulus-neutral clear silicone if you do.
For a good-quality roof that will last, avoid wide sheets and use the recommended widths of 980 mm or less for roofs up to 4m long and 700mm wide for roofs 4m plus.
Fix the wall plates at the top and bottom, and fix the joists as you fix the bars.
Use 9mm economy fascias all around and square white gutters for a maintenance-free finish.
Not Sure? Email us we are here to help.

Delivery Service—If you do not have personnel available to unload the lorry, please select two-man delivery as one of the options. This is a surcharge in addition to the standard delivery charge.

Write a review

Please login or register to review